Server Failure Disrupts Prepaid Meter Recharges, Sparks Power Outages and Protests Across Tripura

By Our Correspondent

Agartala, July 7, 2026

Widespread public protests erupted across several parts of Tripura on Monday as prolonged server failures in the state's electricity distribution system reportedly prevented consumers from recharging prepaid smart meters, leading to power disconnections and severe inconvenience. Demonstrations and road blockades were reported from Teliamura, Dharmanagar and Kailashahar, while residents in parts of Dharmanagar also protested over irregular and allegedly unsafe drinking water supply.

The most intense protest took place in Teliamura, where men and women blocked the National Highway after claiming they had been unable to recharge their prepaid electricity meters for nearly three days because of a server malfunction. Protesters alleged that their electricity connections were disconnected despite repeated attempts to recharge, leaving many households without power during the monsoon season.

Residents questioned why consumers should suffer for a technical failure beyond their control and demanded that electricity supply be restored until the server issue is resolved. They suggested that electricity charges could temporarily be adjusted through the previous billing system instead of disconnecting power supply.

As the highway blockade disrupted traffic, the administration deployed police and central paramilitary personnel to clear the road. According to protesters, police resorted to a lathi-charge after they refused to withdraw the blockade, resulting in injuries to several demonstrators, including women. The alleged use of force has triggered criticism from sections of the public, who accused the administration of suppressing protests instead of addressing the underlying technical problem.

Sub-Divisional Magistrate Apurba Krishna Chakraborty and officials from Teliamura Police Station reached the spot and attempted to persuade protesters to lift the blockade. However, demonstrators reportedly remained firm on their demand for immediate restoration of electricity and a permanent solution to the recharge crisis.

Meanwhile, in Dharmanagar, residents alleged that the electricity department's Division-I and Division-II offices have been facing server failures for nearly a week, preventing prepaid meter recharges and delaying new electricity-related services. Long queues of consumers, including elderly people, women and working professionals, were reportedly seen outside the offices, with many returning home without receiving any service.

According to local officials, the disruption is due to a technical fault in the server infrastructure. The Division-II Manager reportedly informed consumers that restoring normal services could take another four to five days. The explanation has further fuelled public anger, with consumers demanding immediate alternative arrangements to ensure uninterrupted electricity supply.

Apart from electricity-related issues, public resentment also surfaced in Dharmanagar Municipal Council areas over drinking water supply. Residents complained that water supplied to several localities was not adequately treated, raising fears of waterborne diseases. Allegations were also made regarding the use of substandard treatment chemicals.

People from Sakhaibari, Shivbari, Mandabpara, Jail Road and adjoining areas staged a road blockade demanding regular and safe drinking water supply. The protest continued for nearly two hours before officials from the Drinking Water and Sanitation (DWS) Department reached the site and assured residents that regular supply of treated drinking water would be restored. The blockade was subsequently withdrawn.

Reports of similar server-related difficulties were also received from the Sekerkote Darogabari Electricity Office in Kamalasagar, where consumers allegedly faced prolonged delays in depositing electricity bills due to persistent technical problems.

The incidents have highlighted growing public concerns over the functioning of the prepaid smart meter system and the dependence on centralized digital infrastructure. Consumers have urged the state government and the Tripura State Electricity Corporation Limited (TSECL) to establish reliable backup mechanisms so that essential services are not disrupted during technical issue.

While local electricity officials have acknowledged a technical server problem in some areas, there has been no detailed statewide statement from the authorities regarding the cause of the outage, the total number of affected consumers, or the timeline for complete restoration of services.

more news...


Post Your Comments Below

Fields with * are mandatory





Posted comments

Till now no approved comments is available.